Course Discussion Forums - Construction Documents Education Program Part 04: Project Delivery Concepts
Slide 7 of 76 Posted by: on 2006-06-09 18:54
Defined term title "Design-Bid-Build", should be "Design-Negotiate-Build". See slide 6 for DBD definition.
Re: Slide 7 of 76 Posted by: on 2006-06-15 13:17
Hi Tom; Thank you for bringing this to our attention, we have corrected slide 7 of our presentation to read Design-Negotiate-Build. The new course PDF has now been uploaded and replaces the old one. Thanks for supporting AEC Daily, and good luck with your continuing education!
Project Delivery Options Posted by: on 2007-03-11 18:03
Under "Options" for slides 35, 41, and 48 - should "Competitive Build" be "Competitive Bid" ?
Re: Project Delivery Options Posted by: on 2007-03-23 14:02
Thank you for bringing this to our attention, we have corrected slides 35, 41 & 48 of our presentation to read Competitively Bid..... The new course PDF has now been uploaded and replaces the old one. Thanks for supporting AEC Daily, and good luck with your continuing education!
Slide 56 Posted by: on 2007-03-12 09:17
You might want to add a reference in the slide - the figure (Design-Bid-Build vs. Fast Tract) is Figure 3.3-B from PRM 3.3.3.3
Re: Slide 56 Posted by: on 2007-03-23 14:03
We have added the source information to Slide 56 as suggested. Thank you for your input and good luck with your continuing education!