MyAEC
Daily
Login
username:
password:
I forgot my password.
Create a
MyAEC
Daily
Account
To start taking courses, sign up for a
free
MyAEC
Daily
account.
Advertising
|
Partner Opportunities
|
Privacy Policy
|
Contact Us
Search:
AECDaily Reference Library
31 - Earthwork
Request a free listing
All Listings
31 00 00 - EARTHWORK
31 01 00 - Maintenance of Earthwork
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 40 - Maintenance of Shoring and Underpinning
31 01 50 - Maintenance of Excavation Support and Protection
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 63 - Maintenance of Bored and Augered Piles
31 01 70 - Maintenance of Tunneling and Mining
31 05 00 - Common Work Results for Earthwork
31 05 13 - Soils for Earthwork
31 05 16 - Aggregates for Earthwork
31 05 19 - Geosynthetics for Earthwork
31 05 23 - Cement and Concrete for Earthwork
31 06 00 - Schedules for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 40 - Schedules for Shoring and Underpinning
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 06 70 - Schedules for Tunneling and Mining
31 08 00 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 10 00 - SITE CLEARING
31 11 00 - Clearing and Grubbing
31 12 00 - Selective Clearing
31 13 00 - Selective Tree and Shrub Removal and Trimming
31 13 13 - Selective Tree and Shrub Removal
31 13 16 - Selective Tree and Shrub Trimming
31 14 00 - Earth Stripping and Stockpiling
31 14 13 - Soil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 20 00 - EARTH MOVING
31 21 00 - Off-Gassing Mitigation
31 21 13 - Radon Mitigation
31 21 16 - Methane Mitigation
31 22 00 - Grading
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 23 00 - Excavation and Fill
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 19 - Dewatering
31 23 23 - Fill
31 23 33 - Trenching and Backfilling
31 24 00 - Embankments
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 25 00 - Erosion and Sedimentation Controls
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 30 00 - EARTHWORK METHODS
31 31 00 - Soil Treatment
31 31 13 - Rodent Control
31 31 16 - Termite Control
31 31 19 - Vegetation Control
31 32 00 - Soil Stabilization
31 32 13 - Soil Mixing Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 23 - Pressure Grouting Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 32 36 - Soil Nailing
31 33 00 - Rock Stabilization
31 33 13 - Rock Bolting and Grouting
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 33 - Shotcrete Rock Slope Stabilization
31 33 43 - Vegetated Rock Slope Stabilization
31 34 00 - Soil Reinforcement
31 34 19 - Geosynthetic Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 35 00 - Slope Protection
31 35 19 - Geosynthetic Slope Protection
31 35 23 - Slope Protection with Slope Paving
31 35 26 - Containment Barriers
31 36 00 - Gabions
31 36 13 - Gabion Boxes
31 36 19 - Gabion Mattresses
31 37 00 - Riprap
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 40 00 - SHORING AND UNDERPINNING
31 41 00 - Shoring
31 41 13 - Timber Shoring
31 41 16 - Sheet Piling
31 41 19 - Metal Hydraulic Shoring
31 41 23 - Pneumatic Shoring
31 41 33 - Trench Shielding
31 43 00 - Concrete Raising
31 43 13 - Pressure Grouting
31 43 16 - Compaction Grouting
31 43 19 - Mechanical Jacking
31 45 00 - Vibroflotation and Densification
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 00 - Needle Beams
31 46 13 - Cantilever Needle Beams
31 48 00 - Underpinning
31 48 13 - Underpinning Piers
31 48 19 - Bracket Piers
31 48 23 - Jacked Piers
31 48 33 - Micropile Underpinning
31 50 00 - EXCAVATION SUPPORT AND PROTECTION
31 51 00 - Anchor Tiebacks
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 52 00 - Cofferdams
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 53 00 - Cribbing and Walers
31 53 13 - Timber Cribwork
31 54 00 - Ground Freezing
31 56 00 - Slurry Walls
31 56 13 - Bentonite Slurry Walls
31 56 16 - Attapulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 56 26 - Bio-Polymer Trench Drain
31 60 00 - SPECIAL FOUNDATIONS AND LOAD-BEARING ELEMENTS
31 62 00 - Driven Piles
31 62 13 - Concrete Piles
31 62 16 - Steel Piles
31 62 19 - Timber Piles
31 62 23 - Composite Piles
31 63 00 - Bored Piles
31 63 13 - Bored and Augered Test Piles
31 63 16 - Auger Cast Grout Piles
31 63 19 - Bored and Socketed Piles
31 63 23 - Bored Concrete Piles
31 63 26 - Drilled Caissons
31 63 29 - Drilled Concrete Piers and Shafts
31 63 33 - Drilled Micropiles
31 64 00 - Caissons
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 66 00 - Special Foundations
31 66 13 - Special Piles
31 66 16 - Special Foundation Walls
31 66 19 - Refrigerated Foundations
31 68 00 - Foundation Anchors
31 68 13 - Rock Foundation Anchors
31 70 00 - TUNNELING AND MINING
31 71 00 - Tunnel Excavation
31 71 13 - Shield Driving Tunnel Excavation
31 71 16 - Tunnel Excavation by Drilling and Blasting
31 71 19 - Tunnel Excavation by Tunnel Boring Machine
31 72 00 - Tunnel Support Systems
31 72 13 - Rock Reinforcement and Initial Support
31 72 16 - Steel Ribs and Lagging
31 73 00 - Tunnel Grouting
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
31 74 00 - Tunnel Construction
31 74 13 - Cast-in-Place Concrete Tunnel Lining
31 74 16 - Precast Concrete Tunnel Lining
31 74 19 - Shotcrete Tunnel Lining
31 75 00 - Shaft Construction
31 75 13 - Cast-in-Place Concrete Shaft Lining
31 75 16 - Precast Concrete Shaft Lining
31 77 00 - Submersible Tube Tunnels
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 16 - Tube Construction (Outfitting Tunnel Tubes)
31 77 19 - Floating and Laying Submerged Tunnels
Continuing Education
Building Products
News
Subscribe
Contact Us
Advertising Information
Partner Opportunities
Events
Privacy Policy