Continuing Education

This course is no longer active. See other live courses from this sponsor.

A New Design Solution to Reduce the Cost and Time of Bridge Construction: GRS-IBS

Approximately 1 hour

This program will provide an overview of Geosynthetic Reinforced Soil, Integrated Bridge System (GRS-IBS) and is promoted by the Federal Highway Administration to accelerate construction time and offer significant cost savings for the construction of local, county and state bridges. Segmental Retaining Wall (SRW) facing elements, along with geosynthetic reinforcement material, is proving to be a viable solution for a majority of the bridges known to be structurally deficient. The presentation addresses the design concept, key materials, specifications and important construction details. A case study example illustrating the construction sequence is also provided.

Presented by various experts on behalf of Oldcastle APG.

There doesn't seem to be any scheduled live events for this course. REQUEST one at a convenient time and location for you.

 Log in or Create an account to ask the sponsor a question about this course!

 This course is delivered LIVE. It's presented through face-to-face and/or webinar event(s).

This course IS NOT Health, Safety and Welfare eligible.

You can review the privacy policy that applies to this course: Oldcastle APG Privacy Policy