FREE ISE LOGIK WEBINAR
OCTOBER 21, 2021 - 2 PM EDT/11 AM PDT
Learn the specification strategies to eliminate concrete moisture.
|
In the macro critical path of project delivery, installation of final floor finishes is one of the last items to occur prior to substantial completion. However, due to changes in adhesive formulations driven by concerns over indoor environmental quality, most project 09 flooring specifications require moisture testing before flooring can be installed on concrete slabs. Should/when those
moisture tests fail, the project faces burdensome time delays, unexpected costs, or both.
This course qualifies for 1.0 AIA/HSW LU and 0.1 IDCEC/HSW CEU.
|