|
|
|
|
|
|
|
|
Wednesday, September 16, 2026 at 3 PM ET/12 PM PT |
 |
|
Design Detail for Good Acoustics: Part 2 - Ceilings |
AIA (1.0 LU/HSW)
Floor/ceiling assemblies constructed in a lab for testing are built under
ideal conditions and with high levels of precision. |
| REGISTER NOW |
|
|
|
|
|
|
Trash, Recycling, & Linen Chutes: Components and Installation
|
Duration: 1 hour AIA (1.0 LU/HSW) |
| START NOW |
|
|
|
Commercial Planters: Selection Considerations & Material Options
|
Duration: 1 hour 15 minutes IDCEC (0.1 CEU) |
| START NOW |
|
|
|
Acoustics and the Modern Human: Sound Elements as Part of Biophilic Design
|
Duration: 1 hour AIA (1.0 LU/HSW) | GBCI (1.00 CE Hour) | IDCEC (0.1 CEU) |
| START NOW |
|
|
|
Metal Roof Systems: Design & Installation Considerations
|
Duration: 1 hour AIA (1.0 LU/HSW) |
| START NOW |
|
|
|
Air Curtains: Energy Savings & Occupant Comfort
|
Duration: 1 hour 15 minutes AIA (1.25 LU/HSW) | GBCI (1.00 CE Hour) |
| START NOW |
|
|
|
Access Doors and Panels: Contemporary Solutions for Functionality and Aesthetics
|
Duration: 1 hour AIA (1.0 LU/HSW) |
| START NOW |
|
|
|
Sustainable, Strong, & Safe:A Guide to Aluminum Industrial-Strength Ladders
|
Duration: 1 hour AIA (1.0 LU/HSW) | GBCI (1.00 CE Hour) |
| START NOW |
|
|
|
The Art of Airflow: Custom Ventilation Grilles
|
Duration: 1 hour AIA (1.0 LU/HSW) | IDCEC (0.1 CEU) |
| START NOW |
|
|
|
Gas Fireplace Construction & Safety Requirements in Custom Commercial Design
|
Duration: 1 hour AIA (1.0 LU/HSW) | IDCEC (0.1 CEU) |
| START NOW |
|
|
|
From Blueprint to Blue Bin: Managing Waste, Hygiene, and Facility Performance
|
Duration: 1 hour AIA (1.0 LU/HSW) | GBCI (1.00 CE Hour) | IDCEC (0.1 CEU) |
| START NOW |
|
|
|