As North America’s leading manufacturer of concrete building and hardscape products, Oldcastle APG covers a wide spectrum of applications – from the structural masonry, used in erecting outdoor spaces and urban centers, to the finishing touches of...
Mailing Address:
400 Perimeter Center Terrace FL 10 Atlanta GA 30346
USA
Phone: 678-461-2838 Toll-free: 800-820-2342
Long Term Performance and Maintenance of Permeable Interlocking Concrete Pavement Systems
This program provides a brief overview of Permeable Interlocking Concrete Pavement (PICP) systems and then focuses on the long-term surface infiltration performance of these effective stormwater control measures. Mechanisms for sedimentation and clogging of PICP joints is discussed along with a review of ASTM C 1781 testing procedures. Total Suspended Solids (TSS) removal efficiencies and current research on variables that contribute to hydraulic performance of PICPs are discussed. The presentation concludes with information on surface infiltration maintenance and restoration methods including a review of available cleaning machines. PICP maintenance costs and inspection checklists are also reviewed.
Approximately 1 hour. Delivered via webinar or face-to-face presentation. Available sessions shown below.
🍪 We use cookies to offer you a better browsing experience, analyze site traffic,
personalize content, and serve targeted advertisements. Read about how we use
cookies and how you can control them by clicking here.
Click "cookie settings" to adjust your preferences.