Sponsor: ISE Logik Industries, Inc.
Description: In the macro critical path of project delivery, installation of final floor finishes is one of the last items to occur prior to substantial completion. However, due to changes in adhesive formulations driven by concerns over indoor environmental quality, most project 09 flooring specifications require moisture testing before flooring can be installed on concrete slabs. Should/when those moisture tests fail, the project faces burdensome time delays, unexpected costs, or both. During this presentation, we will: (1) briefly discuss the history of concrete moisture and flooring; (2) examine in depth several misconceptions embedded within the AEC associated with field moisture testing and project owner and design team liability associated with concrete moisture induced flooring failure; and (3) we will give clear recommendations as to how the specifying professional can eliminate concrete moisture as a project delivery issue while simultaneously protecting the project owner and design team from project delivery delays/cost overruns and future failed flooring.
Association Information: View Association Details
AIA
AIA approved course. This course qualifies for 1.0 LU/HSW hour.
MCE Information:
Contact your respective governmental licensing and regulatory agency.
Duration: 1.00 hour(s)
Date & Time | Location | Contact | Pre-Register |
---|---|---|---|
Thursday, January 28, 2021 at 12:00 EST (UTC-05:00) | Webinar | Dean Craft | |
Tuesday, February 23, 2021 at 13:15 EST (UTC-05:00) | Webinar | Dean Craft |