Chicago Metallic ceiling system delivers "wow factor" at Florida's MTI

June 06, 2013

(Chicago) -- Florida’s Manatee Technical Institute (MTI) celebrates its 50th anniversary in 2013 with the opening of a new, modern, high-tech Main Campus facility. Students, faculty and visitors are welcomed through the school’s impressive two-story lobby featuring Chicago Metallic® SpanAir® metal panel ceiling systems. Located at 6305 State Road 70 East in Bradenton, Fla., MTI's state-of-the-art $44 million facility boasts 210,000 square feet of space. Designed with the latest energy-efficient construction and teaching technologies, this facility compares with surrounding universities in quality and features. As the building’s main feature, the multi-purpose lobby serves as a 700-person reception area or reconfigured as a 400-seat dining hall. The two-story space directs the eye upward to a sloped, curved ceiling created using Chicago Metallic’s products. Acousti Engineering Company of Florida installed approximately 27,000 square feet of SpanAir metal ceiling panels. MTI broke ground on the project in March 2011. Construction was completed in 18 months.

More